{"id":5578,"date":"2026-07-24T12:37:06","date_gmt":"2026-07-24T12:37:06","guid":{"rendered":"https:\/\/www.fwhtlaw.com\/blog\/?p=5578"},"modified":"2026-07-24T17:59:16","modified_gmt":"2026-07-24T17:59:16","slug":"minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period","status":"publish","type":"post","link":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/","title":{"rendered":"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period"},"content":{"rendered":"\n<h6 class=\"wp-block-heading\"><strong>By <\/strong>Hugh D. Brown and Zachary E. Coppola<\/h6>\n\n\n\n<h6 class=\"wp-block-heading\">Hugh and Zach are members of the firm\u2019s Construction Law Department. Hugh can be reached at 612.359.7663 or <a href=\"mailto:hbrown@fwhtlaw.com\">hbrown@fwhtlaw.com<\/a>. Zach can be reached at 612.359.7667 or <a href=\"mailto:zcoppola@fwhtlaw.com\">zcoppola@fwhtlaw.com<\/a><br><\/h6>\n\n\n<p align=\"justify\">The Minnesota Supreme Court recently resolved a question of first impression under Minnesota&#8217;s construction statute of limitations: when does &#8220;termination \u2026 of the construction or the improvement to real property&#8221; occur under Minn. Stat. \u00a7 541.051, subd. 1(c) when the owner later hires a replacement contractor to finish the job? Does the limitations period commence when the contractor is terminated, or when the project as a whole is complete? The Court held that termination of the contract in question is sufficient to trigger the two-year limitations period, regardless of whether construction ultimately continues under a new contractor.<\/p>\n<p align=\"justify\"><em>American Family Insurance Co. v. NB Electric, Inc.<\/em> stemmed from a 2020 home remodeling project in Little Canada, Minnesota. Morningstar Remodeling, LLC (\u201cMorningstar\u201d) served as the general contractor and subcontracted the electrical work to NB Electric, Inc. (\u201cNB Electric\u201d). In July 2020, a fire broke out during construction, allegedly because NB Electric and Morningstar used nonmetallic cabling and omitted required arc fault circuit interrupters. The homeowner terminated NB Electric about a month after the fire and terminated Morningstar by April 2021. He then hired a new general contractor, Solid Rock Construction, which completed the repairs; the city issued final approval in July 2021.<\/p>\n<p align=\"justify\">American Family, the homeowner&#8217;s insurer, brought a subrogation action against NB Electric and Morningstar in July 2023: more than two years after Morningstar&#8217;s termination but less than two years after Solid Rock&#8217;s substantial completion. The district court granted summary judgment for the contractors, holding that the claims accrued no later than April 2021, when the homeowner terminated Morningstar. A divided court of appeals reversed, reasoning that &#8220;termination \u2026 of the construction or the improvement to real property&#8221; refers to termination of the project as a whole, not termination of an individual contractor&#8217;s engagement, and that, because a new contractor continued the project, no termination (as distinct from eventual substantial completion) had occurred.<\/p>\n<p align=\"justify\">Before the Minnesota Supreme Court, NB Electric argued that &#8220;termination&#8221; means termination of the contract obligating the contractor to perform the work; here, the homeowner\u2019s contract with Morningstar, so the claim accrued in April 2021. American Family pressed several counterarguments. First, it argued the statute is unambiguous because it says nothing about a &#8220;contract&#8221; or &#8220;contractor,&#8221; and that the Court&#8217;s decision in <em>Moore v. Robinson Environmental<\/em> already established that similar language in the statute refers to the entire project rather than any one contractor&#8217;s role. Second, it argued that NB Electric&#8217;s reading was unworkable because it would require an owner to track every subcontractor&#8217;s individual scope and completion date. Third, it argued that its own project-wide reading better served &#8220;uniformity, predictability, and timely resolution of disputes&#8221; in the construction industry.<\/p>\n<p align=\"justify\">The Court rejected each of American Family\u2019s arguments. On the textual point, it held the statute&#8217;s silence cuts both ways because it also never uses the phrase &#8220;entire construction project,&#8221; so the absence of the word &#8220;contract&#8221; does not resolve anything. It distinguished <em>Moore<\/em> on the ground that no contractor had been terminated in that case, so the Court&#8217;s &#8220;judicial mind&#8221; there was never trained on the specific question of what termination does to accrual. On the subcontractor tracking argument, the Court found it beside the point because an owner need only know the status of its own general contractor, not the status of every subcontractor working beneath it. And on uniformity and predictability, the Court observed that &#8220;the entire construction project&#8221; is an inherently fluid concept, especially where work is phased, so anchoring accrual to that concept would create more unpredictability, not less.<\/p>\n<p align=\"justify\">Having found the statute ambiguous, the Court turned to legislative history behind the 2018 amendment that added the &#8220;substantial completion, termination, or abandonment&#8221; trigger to subdivision 1(c). That amendment responded to the Court&#8217;s 2015 decision in <em>328 Barry Avenue, LLC v. Nolan Properties Group, LLC<\/em>, which held that a defect claim could accrue, and the limitations clock could start running, before a project was ever substantially complete, even where everyone expected the problem to be fixed before completion. The Minnesota State Bar Association pushed the fix, framing it as protection against forcing parties into premature litigation over defects both sides expected to be repaired.<\/p>\n<p align=\"justify\">The Court also found the legislative record tied &#8220;termination&#8221; specifically to the contractual relationship \u2013 not the project. In doing so, it highlighted MSBA Construction Law Section member (and Fabyanske shareholder) Dean Thomson\u2019s testimony before the Senate Judiciary and Public Safety Finance and Policy Committee in which he explained that the amendment was &#8220;proposing that we run the statute of limitations no earlier than the date of substantial completion, or abandonment of the project, or termination of the contract in question.&#8221; The Court treated that testimony as strong evidence that the Legislature meant termination of the contract, not termination of the undertaking as a whole.<\/p>\n<p align=\"justify\">Finally, the Court weighed the consequences of each reading. Under American Family&#8217;s approach, a construction project might never be &#8220;terminated&#8221; at all, as an owner who fires a general contractor and simply delays replacing it \u2013 indefinitely if the owner chooses \u2013 could keep the limitations period from ever starting, leaving the terminated contractor&#8217;s exposure hostage to decisions made entirely by someone else on a timeline outside the contractor&#8217;s control. The Court held that result irreconcilable with the basic purpose of a statute of limitations: giving defendants reasonable certainty about when their exposure to old claims closes.<\/p>\n<p align=\"justify\">Takeaways: The Court&#8217;s holding provides owners, general contractors, and subcontractors with a bright-line rule that should be straightforward to apply going forward: once a general contractor&#8217;s contract is terminated, the two-year clock starts, unless discovery of the injury occurs later, in which case discovery controls, whether or not the owner brings in someone else to finish the job. The decision is particularly welcome for general contractors, since their own termination date now fixes a clear outer bound to their exposure, regardless of how long the owner takes to hire a replacement or how long the replacement takes to finish the job.<\/p>\n<p align=\"justify\">The benefit to subcontractors is less certain, particularly where a subcontractor is terminated or replaced, but the general contractor and the project continue. The Court did not decide whether a subcontractor&#8217;s own termination, distinct from the general contractor&#8217;s, could independently start the clock. Subcontractors terminated well before the general contractor should not assume the point is settled in their favor; until a court squarely addresses it, the safer assumption is that accrual runs from the general contractor&#8217;s termination date. Owners and their counsel should also take care to document the date a general contractor&#8217;s engagement actually ends, since that date, not the completion date of any replacement contractor, now controls when the limitations period begins to run.<\/p>\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong><u>Announcements<\/u><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Congratulations to the ten attorneys from<strong>&nbsp;Fabyanske, Westra, Hart &amp; Thomson, P.A.&nbsp;<\/strong>who have been named <strong>2026 \u201cMinnesota Super Lawyers\u201d. <\/strong>The polling, researching, and selecting of \u201cSuper Lawyers\u201d is designed to identify Minnesota lawyers who have attained a high degree of peer recognition and professional achievement. Only five percent of Minnesota attorneys receive this honor. FWHT\u2019s 2026&nbsp; \u201cMinnesota Super Lawyers\u201d include<strong>&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/mark-r-becker\">Mark Becker<\/a>,&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/hugh-d-brown\">Hugh Brown,<\/a>&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/matthew-t-collins\">Matt Collins,<\/a>&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/julia-j-douglass\">Julia Douglass<\/a>,&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/rory-o-duggan\">Rory Duggan,<\/a>&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/kyle-e-hart\">Kyle Hart<\/a>,&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/jesse-r-orman\">Jesse Orman<\/a>,&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/elise-r-radaj\">Elise Radaj<\/a>,&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/nathan-r-sellers\">Nathan Sellers<\/a>&nbsp;<\/strong>and<strong>&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/dean-b-thomson\">Dean Thomson.<\/a>&nbsp;Dean Thomson <\/strong>was also selected as a<strong> Top 100 \u201cSuper Lawyer\u201d. <\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Congratulations to the<strong>&nbsp;Fabyanske, Westra, Hart &amp; Thomson, P.A.&nbsp;<\/strong>attorneys who have been named <strong>Super Lawyer\u2019s 2026 Minnesota \u201cRising Stars\u201d. <\/strong>They are<strong>&nbsp;<a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/colin-mbruns\">Colin Bruns<\/a>&nbsp;<\/strong>and&nbsp;<strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/erinn-b-valine\">Erinn Valine<\/a>. <\/strong>\u201cRising Stars\u201d are nominated by their peers and must be 40 years old or under, or have been practicing for 10 years or less. No more than 2.5 percent of the lawyers in the state are named to the list.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Six attorneys from <strong>Fabyanske, Westra, Hart &amp; Thomson, P.A.<\/strong> have been named to the <strong>2026 Legal 500 City Elite listing.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The selected attorneys and practice areas in which they were recognized are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/julia-j-douglass\">Julia J. Douglass<\/a><\/strong> &#8211; Commercial Disputes<\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/rory-o-duggan\">Rory O. Duggan<\/a><\/strong> &#8211; Banking &amp; Finance<\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/frederick-h-ladner\">Fred H. Ladner<\/a><\/strong> &#8211; Banking &amp; Finance<\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/katie-welsch\">Katie A. Welsch<\/a><\/strong> &#8211; Banking &amp; Finance<\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/paul-w-muilenberg\">Paul W. Muilenberg<\/a><\/strong> &#8211; Corporate and M&amp;A<\/li>\n\n\n\n<li><strong><a href=\"https:\/\/www.fwhtlaw.com\/attorneys\/thomas-j-tucci\">Thomas J. Tucci<\/a><\/strong> &#8211; Corporate and M&amp;A<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Also, <strong>Fabyanske, Westra, Hart &amp; Thomson&#8217;s Construction<\/strong> Group were ranked nationally for the first time this year.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"#_ftnref1\" name=\"_ftn1\"><\/a><\/p>\n\n\n\n<h6 class=\"wp-block-heading\"><em>This discussion is generalized in nature and should not be considered a substitute for professional advice. \u00a9 2026 FWH&amp;T.<\/em><\/h6>\n","protected":false},"excerpt":{"rendered":"<p>By Hugh D. Brown and Zachary E. Coppola Hugh and Zach are members of the firm\u2019s Construction Law Department. Hugh can be reached at 612.359.7663 or hbrown@fwhtlaw.com. Zach can be reached at 612.359.7667\u2026<\/p>\n","protected":false},"author":8,"featured_media":5373,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8,7,19,12,60],"tags":[],"class_list":["post-5578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-announcements","category-briefing-papers","category-hugh-d-brown","category-news","category-zachary-e-coppola"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.12 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period - Fabyanske, Westra, Hart &amp; Thomson<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period - Fabyanske, Westra, Hart &amp; Thomson\" \/>\n<meta property=\"og:description\" content=\"By Hugh D. Brown and Zachary E. Coppola Hugh and Zach are members of the firm\u2019s Construction Law Department. Hugh can be reached at 612.359.7663 or hbrown@fwhtlaw.com. Zach can be reached at 612.359.7667\u2026\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/\" \/>\n<meta property=\"og:site_name\" content=\"Fabyanske, Westra, Hart &amp; Thomson\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-24T12:37:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-24T17:59:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.fwhtlaw.com\/blog\/wp-content\/uploads\/2025\/05\/HDB-ZEC-550x275-2-copy.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"550\" \/>\n\t<meta property=\"og:image:height\" content=\"275\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Mansir\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Mansir\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/\",\"url\":\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/\",\"name\":\"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period - Fabyanske, Westra, Hart &amp; Thomson\",\"isPartOf\":{\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/#website\"},\"datePublished\":\"2026-07-24T12:37:06+00:00\",\"dateModified\":\"2026-07-24T17:59:16+00:00\",\"author\":{\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/#\/schema\/person\/6b135c74354fdf14ce071a939f531d92\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.fwhtlaw.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/#website\",\"url\":\"https:\/\/www.fwhtlaw.com\/blog\/\",\"name\":\"Fabyanske, Westra, Hart &amp; Thomson\",\"description\":\"Twin Cities Law Firm | Business Attorneys\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.fwhtlaw.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/#\/schema\/person\/6b135c74354fdf14ce071a939f531d92\",\"name\":\"John Mansir\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.fwhtlaw.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/127405e9f8f9272ac5748796e7ddc8013e1b51eb3e9eafeb91c84180a9d11105?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/127405e9f8f9272ac5748796e7ddc8013e1b51eb3e9eafeb91c84180a9d11105?s=96&d=mm&r=g\",\"caption\":\"John Mansir\"},\"url\":\"https:\/\/www.fwhtlaw.com\/blog\/author\/jmansirfwhtlaw-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period - Fabyanske, Westra, Hart &amp; Thomson","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/","og_locale":"en_US","og_type":"article","og_title":"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period - Fabyanske, Westra, Hart &amp; Thomson","og_description":"By Hugh D. Brown and Zachary E. Coppola Hugh and Zach are members of the firm\u2019s Construction Law Department. Hugh can be reached at 612.359.7663 or hbrown@fwhtlaw.com. Zach can be reached at 612.359.7667\u2026","og_url":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/","og_site_name":"Fabyanske, Westra, Hart &amp; Thomson","article_published_time":"2026-07-24T12:37:06+00:00","article_modified_time":"2026-07-24T17:59:16+00:00","og_image":[{"width":550,"height":275,"url":"https:\/\/www.fwhtlaw.com\/blog\/wp-content\/uploads\/2025\/05\/HDB-ZEC-550x275-2-copy.jpg","type":"image\/jpeg"}],"author":"John Mansir","twitter_card":"summary_large_image","twitter_misc":{"Written by":"John Mansir","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/","url":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/","name":"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period - Fabyanske, Westra, Hart &amp; Thomson","isPartOf":{"@id":"https:\/\/www.fwhtlaw.com\/blog\/#website"},"datePublished":"2026-07-24T12:37:06+00:00","dateModified":"2026-07-24T17:59:16+00:00","author":{"@id":"https:\/\/www.fwhtlaw.com\/blog\/#\/schema\/person\/6b135c74354fdf14ce071a939f531d92"},"breadcrumb":{"@id":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.fwhtlaw.com\/blog\/2026\/07\/24\/minnesota-supreme-court-clarifies-accrual-date-of-construction-defect-limitations-period\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fwhtlaw.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Minnesota Supreme Court Clarifies Accrual Date of Construction Defect Limitations Period"}]},{"@type":"WebSite","@id":"https:\/\/www.fwhtlaw.com\/blog\/#website","url":"https:\/\/www.fwhtlaw.com\/blog\/","name":"Fabyanske, Westra, Hart &amp; Thomson","description":"Twin Cities Law Firm | Business Attorneys","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fwhtlaw.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.fwhtlaw.com\/blog\/#\/schema\/person\/6b135c74354fdf14ce071a939f531d92","name":"John Mansir","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.fwhtlaw.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/127405e9f8f9272ac5748796e7ddc8013e1b51eb3e9eafeb91c84180a9d11105?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/127405e9f8f9272ac5748796e7ddc8013e1b51eb3e9eafeb91c84180a9d11105?s=96&d=mm&r=g","caption":"John Mansir"},"url":"https:\/\/www.fwhtlaw.com\/blog\/author\/jmansirfwhtlaw-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/posts\/5578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/comments?post=5578"}],"version-history":[{"count":3,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/posts\/5578\/revisions"}],"predecessor-version":[{"id":5586,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/posts\/5578\/revisions\/5586"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/media\/5373"}],"wp:attachment":[{"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/media?parent=5578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/categories?post=5578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fwhtlaw.com\/blog\/wp-json\/wp\/v2\/tags?post=5578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}